{"id":16406,"date":"2025-06-25T12:45:41","date_gmt":"2025-06-25T07:15:41","guid":{"rendered":"http:\/\/energymin.gov.lk\/power\/?p=16406"},"modified":"2025-06-27T12:46:25","modified_gmt":"2025-06-27T07:16:25","slug":"energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa","status":"publish","type":"post","link":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/","title":{"rendered":"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa."},"content":{"rendered":"<p>The Minister of Energy, Eng. Kumara Jayakody, made a side visit yesterday (25<sup>th<\/sup>) to inspect the land and look into the progress of the Siyabalanduwa \u201cRividhanavi\u201d Solar Project, which is considered as the first ever large-scale national project implemented with a significant investment of USD 432 Million to integrate 100MW to the National Power Grid.<\/p>\n<p>It is expected that this massive project, which is to be constructed on a large area of nearly 219 hectares situated in the Kotiyagala Grama Niladhari Division, Siyambalanduwa Divisional Secretariat of the Monaragala District, will contribute to reduce the atmospheric carbon emissions by 110 million kilograms per year.<\/p>\n<p>Furthermore, this project is considered likely to assist in maintaining the stability of the National Power Grid, as it is equipped with a 12MWh Batter Energy Storage System facility.<\/p>\n<p>The Minister was able to observe that preliminary works of the construction such as soil testing, land surveying and chain link fencing have already been carried and he also stated that the unresolved issued will be addressed soon with the necessary interventions.<\/p>\n<p>Monaragala District MP Ajith Agalakada, the chairman of Sustainable Energy Authority Prof. Wijendra Bandara and a group of several other senior officials also participated in this visit.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Minister of Energy, Eng. Kumara Jayakody, made a side visit yesterday (25th) to inspect the land and look into the progress of the Siyabalanduwa \u201cRividhanavi\u201d Solar Project, which is considered as the first ever large-scale national project implemented with a significant investment of USD 432 Million to integrate 100MW to the National Power Grid&#8230;.<\/p>\n","protected":false},"author":1,"featured_media":16402,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16406","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa. | Ministry of Energy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa. | Ministry of Energy\" \/>\n<meta property=\"og:description\" content=\"The Minister of Energy, Eng. Kumara Jayakody, made a side visit yesterday (25th) to inspect the land and look into the progress of the Siyabalanduwa \u201cRividhanavi\u201d Solar Project, which is considered as the first ever large-scale national project implemented with a significant investment of USD 432 Million to integrate 100MW to the National Power Grid....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/\" \/>\n<meta property=\"og:site_name\" content=\"Ministry of Energy\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/powermin.gov.lk\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-25T07:15:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-27T07:16:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2025\/06\/01-8.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"824\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"kannan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"kannan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/\"},\"author\":{\"name\":\"kannan\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#\\\/schema\\\/person\\\/5ffeae1af6afbea523a3ff47fd59cc07\"},\"headline\":\"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa.\",\"datePublished\":\"2025-06-25T07:15:41+00:00\",\"dateModified\":\"2025-06-27T07:16:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/\"},\"wordCount\":221,\"image\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energymin.gov.lk\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/01-8.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/\",\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/\",\"name\":\"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa. | Ministry of Energy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energymin.gov.lk\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/01-8.jpeg\",\"datePublished\":\"2025-06-25T07:15:41+00:00\",\"dateModified\":\"2025-06-27T07:16:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#\\\/schema\\\/person\\\/5ffeae1af6afbea523a3ff47fd59cc07\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/01-8.jpeg\",\"contentUrl\":\"https:\\\/\\\/energymin.gov.lk\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/01-8.jpeg\",\"width\":1600,\"height\":824},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/06\\\/25\\\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energymin.gov.lk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#website\",\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/\",\"name\":\"Energy Ministry Sri lanka\",\"description\":\"Welcome to Ministry of Energy\",\"alternateName\":\"Ministry of Power\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energymin.gov.lk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#\\\/schema\\\/person\\\/5ffeae1af6afbea523a3ff47fd59cc07\",\"name\":\"kannan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/35d979b3adaf51366cdfbcee25bbc6d650081314ce72eafe2eb735261b0d8a4f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/35d979b3adaf51366cdfbcee25bbc6d650081314ce72eafe2eb735261b0d8a4f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/35d979b3adaf51366cdfbcee25bbc6d650081314ce72eafe2eb735261b0d8a4f?s=96&d=mm&r=g\",\"caption\":\"kannan\"},\"sameAs\":[\"http:\\\/\\\/103.1.179.75\\\/power\"],\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/author\\\/kannan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa. | Ministry of Energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/","og_locale":"en_US","og_type":"article","og_title":"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa. | Ministry of Energy","og_description":"The Minister of Energy, Eng. Kumara Jayakody, made a side visit yesterday (25th) to inspect the land and look into the progress of the Siyabalanduwa \u201cRividhanavi\u201d Solar Project, which is considered as the first ever large-scale national project implemented with a significant investment of USD 432 Million to integrate 100MW to the National Power Grid....","og_url":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/","og_site_name":"Ministry of Energy","article_publisher":"https:\/\/www.facebook.com\/powermin.gov.lk","article_published_time":"2025-06-25T07:15:41+00:00","article_modified_time":"2025-06-27T07:16:25+00:00","og_image":[{"width":1600,"height":824,"url":"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2025\/06\/01-8.jpeg","type":"image\/jpeg"}],"author":"kannan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"kannan","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#article","isPartOf":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/"},"author":{"name":"kannan","@id":"https:\/\/energymin.gov.lk\/#\/schema\/person\/5ffeae1af6afbea523a3ff47fd59cc07"},"headline":"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa.","datePublished":"2025-06-25T07:15:41+00:00","dateModified":"2025-06-27T07:16:25+00:00","mainEntityOfPage":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/"},"wordCount":221,"image":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#primaryimage"},"thumbnailUrl":"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2025\/06\/01-8.jpeg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/","url":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/","name":"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa. | Ministry of Energy","isPartOf":{"@id":"https:\/\/energymin.gov.lk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#primaryimage"},"image":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#primaryimage"},"thumbnailUrl":"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2025\/06\/01-8.jpeg","datePublished":"2025-06-25T07:15:41+00:00","dateModified":"2025-06-27T07:16:25+00:00","author":{"@id":"https:\/\/energymin.gov.lk\/#\/schema\/person\/5ffeae1af6afbea523a3ff47fd59cc07"},"breadcrumb":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#primaryimage","url":"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2025\/06\/01-8.jpeg","contentUrl":"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2025\/06\/01-8.jpeg","width":1600,"height":824},{"@type":"BreadcrumbList","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/06\/25\/energy-minister-eng-kumara-jayakody-joins-a-site-visit-to-look-into-the-progress-of-the-100mw-rividhanavi-large-scale-national-project-in-siyambalanduwa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energymin.gov.lk\/"},{"@type":"ListItem","position":2,"name":"Energy Minister Eng. Kumara Jayakody Joins a Site Visit to Look into the Progress Of The 100MW \u201cRividhanavi\u201d Large-Scale National Project in Siyambalanduwa."}]},{"@type":"WebSite","@id":"https:\/\/energymin.gov.lk\/#website","url":"https:\/\/energymin.gov.lk\/","name":"Energy Ministry Sri lanka","description":"Welcome to Ministry of Energy","alternateName":"Ministry of Power","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energymin.gov.lk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energymin.gov.lk\/#\/schema\/person\/5ffeae1af6afbea523a3ff47fd59cc07","name":"kannan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/35d979b3adaf51366cdfbcee25bbc6d650081314ce72eafe2eb735261b0d8a4f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/35d979b3adaf51366cdfbcee25bbc6d650081314ce72eafe2eb735261b0d8a4f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/35d979b3adaf51366cdfbcee25bbc6d650081314ce72eafe2eb735261b0d8a4f?s=96&d=mm&r=g","caption":"kannan"},"sameAs":["http:\/\/103.1.179.75\/power"],"url":"https:\/\/energymin.gov.lk\/index.php\/author\/kannan\/"}]}},"_links":{"self":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts\/16406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/comments?post=16406"}],"version-history":[{"count":1,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts\/16406\/revisions"}],"predecessor-version":[{"id":16407,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts\/16406\/revisions\/16407"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/media\/16402"}],"wp:attachment":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/media?parent=16406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/categories?post=16406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/tags?post=16406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}