{"id":16816,"date":"2025-08-21T14:35:00","date_gmt":"2025-08-21T09:05:00","guid":{"rendered":"http:\/\/energymin.gov.lk\/power\/?p=16816"},"modified":"2026-02-18T14:34:00","modified_gmt":"2026-02-18T09:04:00","slug":"news-08-25-08","status":"publish","type":"post","link":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/","title":{"rendered":"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament."},"content":{"rendered":"<p>The Minister of Energy revealed in Parliament today (21) that several short-term and long-term steps<br \/>\nhave been taken to maintain the stability of the national power system, in response to a question<br \/>\nraised by Member of Parliament Mr. Kavinda Jayawardena.<br \/>\nThe short-term and long-term steps are as follows.<br \/>\nShort-term Steps<\/p>\n<p>\uf0b7 Updating inverter parameters in rooftop solar PV systems to maintain their stability during<br \/>\nsudden fluctuations in the national power system.<br \/>\n\uf0b7 Introducing technical and regulatory steps to encourage on-site\/on-premises energy generation<br \/>\nand consumption in response to grid stability related issues instead of solely supplying the<br \/>\nenergy generated by rooftop solar PV systems to the grid.<br \/>\n\uf0b7 Operating hydro and thermal power plants in synchronous condenser mode whenever<br \/>\npossible.<br \/>\n\uf0b7 Since it is very difficult to maintain system stability during the daytime with high sunlight, on<br \/>\nholidays with low demand, such as Sundays;<br \/>\nMaintaining the stability of the national power system by controlling\/limiting the<br \/>\nsupply from solar and wind power plants, currently managed by the System Control<br \/>\nCenter, based on the requirement of the national electricity system.<br \/>\nRequesting the power plants [Generators connected to the distribution network<br \/>\n(Embedded Generators)] that are not controlled by the System Control Center to stop<br \/>\ngeneration. System Control Center, through the Distribution Control Centers and<br \/>\nregional electrical engineers, request that generators connected to the distribution<br \/>\nnetwork to stop generating and most owners comply, except for a few.<\/p>\n<p>\uf0b7 Renewable power plants are to be integrated to the national power system and a Time-Based<br \/>\nTariff has been formulated and implemented to integrate Battery Energy Storage Systems<br \/>\n(BESS) in support of national power system stability following approval from the Cabinet of<br \/>\nMinisters.<br \/>\n\uf0b7 Arrangements have been made thorough the Power Purchase Agreements to take legal and<br \/>\ntechnical actions that are required to control all wind and solar power plants to be connected<br \/>\nto the national power system in the future under the System Control Center.<\/p>\n<p>\uf0b7 Analyzing and updating of existing technical parameters [e.g. Spinning Reserve requirement,<br \/>\nUnder Frequency Load Shedding (UFLS)] is currently underway in order to maintain the<br \/>\nstability of the national power system during unstable conditions.<br \/>\n\uf0b7 Implementing a technical procedure to ensure safe shutdown of the Lakvijaya Power Plant.<\/p>\n<p>Long-term Steps<\/p>\n<p>\uf0b7 Two main sites have been identified for the construction of the Pump Storage Power Plant,<br \/>\nout of which Maha Oya has been selected as the most suitable location and a detailed<br \/>\nfeasibility study has been conducted, and arrangements have been made to prepare a detailed<br \/>\nestimate, allocate the required lands, etc.<br \/>\n\uf0b7 Large-scale battery power plants with capacities of 100MW and 160 MW are scheduled to be<br \/>\nconstructed and integrated to the national power system by 2026 and 2027. Tenders have been<br \/>\nfloated for 160 MW capacity, and it is anticipated to invite tenders for the 100 MW power<br \/>\nplant in the future utilizing funds from the Asian Development Bank.<br \/>\n\uf0b7 The preparation of Tender documents are underway to invite tenders for the installation of a<br \/>\nRenewable Energy Control Unit to forecast renewable energy sources and control those power<br \/>\nplant systems through control centers using funds from the Asian Development Bank.<br \/>\n\uf0b7 It has been planned to integrate electronic devices (eg: STATCOM, synchronous Condenser)<br \/>\nthat are used for the purpose of maintaining the stability of the transmission system in the<br \/>\nfuture.<br \/>\n\uf0b7 Arrangements are underway to integrate flexible power plants with inertia into the national<br \/>\npower system to help maintain the grid stability as the national power system absorbs more<br \/>\nrenewable energy.<br \/>\n\uf0b7 Introduction of necessary additional smart meters functions that enable remote monitoring and<br \/>\nemergency disconnection.<br \/>\n\uf0b7 The Distribution Control Center project has been commenced to ensure real-time monitoring<br \/>\n(visibility) and controllability of Non-Conventional Renewable Energy either through<br \/>\nmanufacturers&amp;#39; inverters or by installing SIM card-equipped modems.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Minister of Energy revealed in Parliament today (21) that several short-term and long-term steps have been taken to maintain the stability of the national power system, in response to a question raised by Member of Parliament Mr. Kavinda Jayawardena. The short-term and long-term steps are as follows. Short-term Steps \uf0b7 Updating inverter parameters in&#8230;<\/p>\n","protected":false},"author":400000,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16816","post","type-post","status-publish","format-standard","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament. | Ministry of Energy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament. | Ministry of Energy\" \/>\n<meta property=\"og:description\" content=\"The Minister of Energy revealed in Parliament today (21) that several short-term and long-term steps have been taken to maintain the stability of the national power system, in response to a question raised by Member of Parliament Mr. Kavinda Jayawardena. The short-term and long-term steps are as follows. Short-term Steps \uf0b7 Updating inverter parameters in...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/\" \/>\n<meta property=\"og:site_name\" content=\"Ministry of Energy\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/powermin.gov.lk\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-21T09:05:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-18T09:04:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2023\/05\/png-transparent-department-of-examinations-general-certificate-of-education-school-gce-ordinary-level-in-sri-lanka-school-emblem-logo-teacher.png\" \/>\n\t<meta property=\"og:image:width\" content=\"920\" \/>\n\t<meta property=\"og:image:height\" content=\"1265\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Tharooshi Vihanga\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tharooshi Vihanga\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/\"},\"author\":{\"name\":\"Tharooshi Vihanga\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#\\\/schema\\\/person\\\/e9da2e3d88dd66783cf499a6df374bae\"},\"headline\":\"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament.\",\"datePublished\":\"2025-08-21T09:05:00+00:00\",\"dateModified\":\"2026-02-18T09:04:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/\"},\"wordCount\":629,\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/\",\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/\",\"name\":\"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament. | Ministry of Energy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#website\"},\"datePublished\":\"2025-08-21T09:05:00+00:00\",\"dateModified\":\"2026-02-18T09:04:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#\\\/schema\\\/person\\\/e9da2e3d88dd66783cf499a6df374bae\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/2025\\\/08\\\/21\\\/news-08-25-08\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energymin.gov.lk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#website\",\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/\",\"name\":\"Energy Ministry Sri lanka\",\"description\":\"Welcome to Ministry of Energy\",\"alternateName\":\"Ministry of Power\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energymin.gov.lk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energymin.gov.lk\\\/#\\\/schema\\\/person\\\/e9da2e3d88dd66783cf499a6df374bae\",\"name\":\"Tharooshi Vihanga\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/17ce4d5ec5384a4bce944354b5df698e01c183b5b9820f18633d98d1b259c629?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/17ce4d5ec5384a4bce944354b5df698e01c183b5b9820f18633d98d1b259c629?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/17ce4d5ec5384a4bce944354b5df698e01c183b5b9820f18633d98d1b259c629?s=96&d=mm&r=g\",\"caption\":\"Tharooshi Vihanga\"},\"url\":\"https:\\\/\\\/energymin.gov.lk\\\/index.php\\\/author\\\/vihanga\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament. | Ministry of Energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/","og_locale":"en_US","og_type":"article","og_title":"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament. | Ministry of Energy","og_description":"The Minister of Energy revealed in Parliament today (21) that several short-term and long-term steps have been taken to maintain the stability of the national power system, in response to a question raised by Member of Parliament Mr. Kavinda Jayawardena. The short-term and long-term steps are as follows. Short-term Steps \uf0b7 Updating inverter parameters in...","og_url":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/","og_site_name":"Ministry of Energy","article_publisher":"https:\/\/www.facebook.com\/powermin.gov.lk","article_published_time":"2025-08-21T09:05:00+00:00","article_modified_time":"2026-02-18T09:04:00+00:00","og_image":[{"width":920,"height":1265,"url":"https:\/\/energymin.gov.lk\/wp-content\/uploads\/2023\/05\/png-transparent-department-of-examinations-general-certificate-of-education-school-gce-ordinary-level-in-sri-lanka-school-emblem-logo-teacher.png","type":"image\/png"}],"author":"Tharooshi Vihanga","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tharooshi Vihanga","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/#article","isPartOf":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/"},"author":{"name":"Tharooshi Vihanga","@id":"https:\/\/energymin.gov.lk\/#\/schema\/person\/e9da2e3d88dd66783cf499a6df374bae"},"headline":"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament.","datePublished":"2025-08-21T09:05:00+00:00","dateModified":"2026-02-18T09:04:00+00:00","mainEntityOfPage":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/"},"wordCount":629,"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/","url":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/","name":"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament. | Ministry of Energy","isPartOf":{"@id":"https:\/\/energymin.gov.lk\/#website"},"datePublished":"2025-08-21T09:05:00+00:00","dateModified":"2026-02-18T09:04:00+00:00","author":{"@id":"https:\/\/energymin.gov.lk\/#\/schema\/person\/e9da2e3d88dd66783cf499a6df374bae"},"breadcrumb":{"@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/energymin.gov.lk\/index.php\/2025\/08\/21\/news-08-25-08\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energymin.gov.lk\/"},{"@type":"ListItem","position":2,"name":"Minister of Energy Eng. Kumara Jayakody Reveals Several Key Steps That Ensure Stability of the National Power System in Parliament."}]},{"@type":"WebSite","@id":"https:\/\/energymin.gov.lk\/#website","url":"https:\/\/energymin.gov.lk\/","name":"Energy Ministry Sri lanka","description":"Welcome to Ministry of Energy","alternateName":"Ministry of Power","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energymin.gov.lk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energymin.gov.lk\/#\/schema\/person\/e9da2e3d88dd66783cf499a6df374bae","name":"Tharooshi Vihanga","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/17ce4d5ec5384a4bce944354b5df698e01c183b5b9820f18633d98d1b259c629?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/17ce4d5ec5384a4bce944354b5df698e01c183b5b9820f18633d98d1b259c629?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/17ce4d5ec5384a4bce944354b5df698e01c183b5b9820f18633d98d1b259c629?s=96&d=mm&r=g","caption":"Tharooshi Vihanga"},"url":"https:\/\/energymin.gov.lk\/index.php\/author\/vihanga\/"}]}},"_links":{"self":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts\/16816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/users\/400000"}],"replies":[{"embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/comments?post=16816"}],"version-history":[{"count":1,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts\/16816\/revisions"}],"predecessor-version":[{"id":16817,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/posts\/16816\/revisions\/16817"}],"wp:attachment":[{"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/media?parent=16816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/categories?post=16816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energymin.gov.lk\/index.php\/wp-json\/wp\/v2\/tags?post=16816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}